Kitchen Remodel Spring 2006
BEFORE WE BEGIN ...
|
Hole in the soffit to see what's cooking up there. |
North view of kitchen with ugly blue floor. Cabinets will be refinished. |
Soffits will come down, ceiling will go up, lighting will be replaced. |
|
View from the Breakfast Room. |
Pantry and desk ... and lots of soffit! Wallpaper will be gone and walls will be painted the same whiteish color as the rest of the main floor. |
Icky blue floor to be replaced with wood. |
|
Breakfast Room ... big changes coming! |
Floor to be replaced with creamy tile. |
Unflattering, ugly fluorescent light will go! |
AFTER WORK DAY 2: DEMOLITION COMPLETE (04/12/06)
|
North view of kitchen -- tile fume hood will stay and is nicely protected! |
Surprise! Electrical needs to be redone ... all the plaster walls come down! |
All that ugly blue floor is gone!!
|
Very messy electric in flexible tubing not up to code. Note the ancient wall paper that was at the back of the pantry. |
|
Ceiling rafters. Ugly old A/C Unit at lower left will be gone and replaced with working transom window. |
Preparing to replace floor with much prettier cream tile. |
Ugly blue tile floor was in the office too, can you believe?? To be replaced with wood. |
Our temporary kitchen in the basement. |
AFTER WORK DAY 7: DRYWALL IS UP (04/19/06)
|
West view: fume hood. |
Northwest view. |
Northeast view. |
|
South view into the Dining Room. |
Powder room light box is gone! Fixture will hang from new outlet on wall where bulb is. |
AFTER WORK DAY 9: DRYWALL IS PRIMED, CABINETS ARE BACK (04/21/06)
|
West view. New oven cabinet will be made and installed to left of these cabinets . |
North view: cooktop to be replaced. |
Northwest view. Note that cabinets are higher than before (by 4 inches). The space will be tiled. |
|
Northeast view. Board covers transom opening. Refrigerator (currently on back porch) will be to left of door. Ceilings will have crown mouldings. |
See Cassie checking it out from the Dining Room "zipper door"? |
Trushie is wondering when this will all be over so life can get back to normal. |
AFTER WORK DAY 16: WOOD FLOORING IS DONE (05/03/06)
|
Monday 4/24: Wood planks are delivered. |
More planks. |
4/28: Floor has been installed and sanded. Stain samples will be removed during final sanding. |
|
Also 4/28: office floor. |
5/3: The staining and finishing are done! |
Office floor. |
AFTER WORK DAY 24: BATHROOM FLOOR, TRIM, AND CABINETRY ARE INSTALLED (05/12/06)
|
5/7: Oven cabinet -- it will have doors on top and a drawer on the bottom. |
5/7: New trim around closet door so it meets the new floor; room door also has new trim. |
5/6: Cracks in Corian around cooktop cut-out have been repaired, and counters have been sanded and polished. |
|
5/8: Powder Room floor is done. |
5/9: New faucet installed (and matching towel ring and toilet paper holder, not shown ). |
5/11: Crown moulding and cabinet trim in kitchen is complete. |
|
5/11: Breakfast Room cabinetry is installed. Lefthand cabinet will have 2 shelves and a door. Radiator cover will have a grille to hide the ugly radiator. Opening on right will be covered with panel to match cabinet door. |
Full view of bench seat. Top is hinged with storage inside (yeah!). On right is another cabinet, which will also have shelves and door. |
Trim around all doors, windows, and new baseboard and "base shoe" are installed. |
AFTER WORK DAY 25: CONSTRUCTION IS MOSTLY DONE! (05/16/06)
|
New oven is installed. |
And so is the cooktop! |
Lighting fixtures have also been installed. There is also one over the kitchen sink and one in the breakfast room.. |
|
Isn't that a handsome transom? We hope the glass will be coming soon!. |
This bathroom light will be much more flattering than that awful fluorescent one! |
Lolly and Trushy are checking out the new landscape. |
STAINING IN PROGRESS (05/29/06)
![]() |
![]() |
![]() |
![]() |
TA DA!!!! (06/30/06)
|
Staining and painting took
a little longer than we expected, and then there were some |
Here are some Before and After pictures.
![]() |
![]() |
![]() |
![]() |
![]() |
|
![]() |
![]() |
|
|
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
A few additional breakfast room views ...
![]() |
![]() |